Calendar

January 2024

Sun

Mon

Tue

Wed

Thu

Fri

Sat

 
  • Fencing or Sheetrock

    New Construction
    4spots remaining

    Is it fencing or is it sheetrock?  It all depends on the weather.  If the weather is dry, we will be doing fencing, if not, we will do sheetrock inside Long work pants and closed-toe shoes are required and don’t forget to bring a water bottle and...

    Get Connected Icon Fencing or Sheet... Fencing or Sheetrock
  • Fencing and/or Sheet Rock

    New Construction
    3spots remaining

    Is it fencing or is it sheetrock?  It all depends on the weather.  If the weather is dry, we will be doing fencing, if not, we will do sheetrock inside Long work pants and closed-toe shoes are required and don’t forget to bring a water bottle and...

    Get Connected Icon Fencing and/or S... Fencing and/or Sheet Rock
  • Sheet Rock Installation

    New Construction
    6spots remaining

    CANCELLED!  Due to the ice storm, all opportunities at Fischer Village this week have been postponed.  We will keep you posted.  In the meantime, stay warm and we hope you have power.  Take good care of yourselves.     Long work pants and close...

    Get Connected Icon Sheet Rock Insta... Sheet Rock Installation
  • Fencing

    New Construction
    6spots remaining

    CANCELLED!  Due to the ice storm, all opportunities at Fischer Village this week have been postponed.  We will keep you posted.  In the meantime, stay warm and we hope you have power.  Take good care of yourselves.     Long work pants and close...

    Get Connected Icon Fencing Fencing
  • Fencing

    New Construction
    1spots remaining

    We are going to finish up fencing at Fischer Village on the R Street side.   Long work pants and closed-toe shoes are required and don’t forget to bring a water bottle and lunch. All necessary tools and training will be provided, including work g...

    Get Connected Icon Fencing Fencing